Ensuring affordable, long term, and environmentally sound disposal of MSW

What material does MWS NOT accept?

Joining Members are precluded by contract from delivering Unacceptable Waste to the facility. Joining Members that make such deliveries despite the contractual prohibition will be required to pay the cost of removing and of providing an appropriate manner for disposal of such materials.  This type of contractual provision is standard in the waste industry and is substantially the same as that included in the expired PERC contracts.

Back to Knowledge Base